Connect land evidence, designs, quantities, approvals, programme and costs. Every decision has an owner and an evidence trail.
TODAY: PROPERTY RESEARCH & DESIGN MODELSWESTERN AUSTRALIA / A RESEARCH & SCOPING PROPOSAL
80,000 homes. A private-sector ambition to make a meaningful difference to housing affordability in Western Australia.
Start with the whole portfolio. Zoom into an actual property, then inspect its terrain, lots, roads and civil layers.
Public cloud atlas · All 48 property studies open directly. Layouts use historical terrain and remain preliminary; landowner participation, approvals and engineering are unresolved.
A secure home gives people room to build a life. Our proposition is to organise land, capital, technology and public decision-making around that outcome.
Scale can create the demand certainty to support manufacturing, shared procurement and investment in new construction methods. A portfolio lets each project improve the next. Those advantages must be demonstrated in a pilot.
This is one possible contribution alongside infill, apartments, affordable rental and social housing. Good places need jobs, services, belonging and a viable cost of living as well as homes.
We developed preliminary layouts property by property, using cadastral boundaries, historical terrain and mapped constraints. The result is a physical research portfolio that can be challenged, improved and costed.
Loading study totals…
Grouped by town search centre, not municipal boundaries. The portfolio is concentrated inland. Employment, local demand, commuting and absorption require testing before any site is prioritised.
The cloud review atlas contains all 43 layers per property, feature inspection and drawing packages. Open any property to explore its design and source evidence.
The layouts contain approximately 3,628 km of roads. That exposes a real cost challenge. Optimising street lengths, land utilisation and infrastructure is a priority for the next design pass.
These are modelled lots, not approved housing supply. Landowner participation, land control and residential rezoning are assumed. Terrain derives from historical 1998–2000 contours, not current survey. Passing geometry checks does not close engineering, environmental or approval requirements.
The thesis is to apply AI across the whole development cycle, then introduce industrialised and autonomous construction where performance is proven. Every completed stage should make the next more predictable.
Connect land evidence, designs, quantities, approvals, programme and costs. Every decision has an owner and an evidence trail.
TODAY: PROPERTY RESEARCH & DESIGN MODELSAgents maintain the programme, develop documentation, compare supplier offers and track dependencies, with accountable professional review.
NEXT: INTEGRATED PILOT WORKFLOWTest factory-made building systems, machine-guided earthworks and robotic assembly against cost, safety, quality and throughput targets.
TO PROVE: FIELD PERFORMANCE & ECONOMICSAlign capital, development expertise and delivery capability around a long-term housing outcome. Fund evidence and own the execution.
Use automation to reduce repeated work, errors and delays. Demonstrate savings in a real pilot before relying on them in a scale-up plan.
Seek coordinated rezoning, referrals and infrastructure decisions with agreed milestones, community engagement and rigorous environmental assessment.
The proposed government role is to coordinate and accelerate decisions and enabling infrastructure. Eligibility and sequencing must be agreed site by site. Existing streamlined development pathways do not establish approval of this programme. WA planning context ↗
Work backwards from a home and land price a household can reach, then test every part of the delivery system against it.
Our working targets are AUD300,000 delivered cost and AUD400,000 sale price. They are hypotheses for validation. Land, the home, civil and off-site works, fees, finance, overhead, contingency and GST treatment must all be reconciled.
At 80,000 homes, the cost target represents AUD24 billion of expenditure over the programme’s life. That is a cumulative delivery envelope; the staged equity, debt and infrastructure funding requirement still needs modelling.
Buyer incomes, deposits, lending access, energy and transport costs must determine who can actually afford the offer. No project return, funding commitment or achieved price is represented here.
80,000 homes divided by the selected period, with a constant AUD300k cost per home. Simple arithmetic: no ramp-up, inflation, approval lead time or demonstrated production capacity. An executable programme needs all four.
We propose a jointly scoped, 90-day investigation to turn this research into an investment decision on a demonstration project. Scope, budget, responsibilities and participation would be agreed together.
Reconcile titles and access, test landholder interest, local demand, jobs, hazards and service connections. Replace weak candidates early.
OUTPUT / RANKED SHORTLISTCommission current survey and technical advice. Develop the stage design, housing specification, infrastructure scope and supplier-backed cost plan.
OUTPUT / COST, RISK & DELIVERY CASEDefine the government pathway, capital structure, community approach and automation trials. Agree clear conditions to proceed, redesign or stop.
OUTPUT / PILOT INVESTMENT DECISIONConvene the principal partners, nominate a small working team and agree the scoping brief. A successful pilot would earn the case for a wider programme.
Bring the property evidence into the room ↗90 days is a proposed scoping window, not a promise of statutory approvals or construction commencement.
This research makes the physical scale visible. The next stage establishes which sites, homes and delivery methods can work commercially and socially.
Earlier regional search & assumptions ↗48 non-overlapping source cadastral polygons, 80,528 drawn lots and 43 layers per property. Layouts have passed the implemented geometry and package checks. Source snapshots, design assumptions, issue registers and reproducible outputs are retained in the project workbench.
The first Northam-area study alone contains 4,883 provisional lots. All portfolio totals come from P02 actual-property studies; the earlier M01 rectangular studies contribute zero.
Titles, landowner participation, contemporary survey and datum, zoning and approvals, environmental and cultural heritage requirements, bushfire and emergency access, engineering design, utility capacity, off-site infrastructure, local demand and project economics.
Drawings remain preliminary. The issue register includes unresolved road geometry, turning, drainage and earthworks matters. Utility corridors do not establish supply. These are not construction or autonomous machine-control instructions.
Research snapshot: 14 October 2026. Need context: Shelter WA’s 19 November 2024 release, based on UNSW estimates for 2021 and 2041. It is not a new estimate of the current deficit.
Detailed cadastral geometry and model downloads are served from the Sydney cloud atlas. Source data remains subject to applicable Landgate licence terms. Publication rights have not been independently confirmed; public access does not confer redistribution rights.
Let’s build the first place.
And the capability to build the next eighty thousand.